References
GEG and its acquired assets have built 16 geothermal power plants in Kenya and Iceland, with a combined total geothermal power generation capacity of 85.6 MW. GEG has further developed and delivered grid connection equipment for plants. This includes large modular substations 87.5 MVA and 40 MVA, as well as mobile substations 8 MVA.