OLK 15 was the last plant built under the 14 plant contract with KenGen on well pad WH-39 with an installed power generation capacity of 5 MW.
OLK15 | WH-39 | 5.0 MWe | Power online in Aug. ’16, handed over in Dec. ‘16 |
OLK 15 was the last plant built under the 14 plant contract with KenGen on well pad WH-39 with an installed power generation capacity of 5 MW.
OLK15 | WH-39 | 5.0 MWe | Power online in Aug. ’16, handed over in Dec. ‘16 |