OLK14 | WH-905 | 5.0 MWe | Power online in Apr. ’16, handed over in Aug. ‘16 |
OLK 14 – 5 MW Kenya
OLK 14 was the second last plant built under the 14 plant contract with KenGen on well pad WH-905 with an installed power generation capacity of 5 MW.