OLK12 | WH-37 | 5.0 MWe | Operating since Feb. ‘16, handed over in July ‘16 |
OLK13 | WH-37B | 5.0 MWe | Operating since Apr. ’16, handed over in Aug. ’16. |
OLK 12 & 13 – 10 MW Kenya
The plants OLK 12 and OLK 13 have both an installed capacity of 5 MW in a single-turbine setup on the same well pad. The started operation in June 2015 and were handed over in June/ July 2015.