OLK11 | WH-919A | 5.0 MWe | Operating since Mar. ‘16, handed over in July ‘16 |
OLK 11 – 5 MW Kenya
The plant OLK 11 has an installed capacity of 5 MW in a single-turbine setup. The plant started operation in March 2016 and was handed over in July 2016.