The plants OLK 09 and OLK 10 have both an installed capacity of 5 MW in a single-turbine setup on the same well pad. The started operation in June 2015 and were handed over in June/ July 2015.

OLK09 WH-915C 5.0 MWe Operating since Jun. ‘15, handed over in July ‘15
OLK10 WH-915D 5.0 MWe Operating since June. ’15, handed over in Jun. ’15.