The plants OLK 09 and OLK 10 have both an installed capacity of 5 MW in a single-turbine setup on the same well pad. The started operation in June 2015 and were handed over in June/ July 2015.
OLK09 | WH-915C | 5.0 MWe | Operating since Jun. ‘15, handed over in July ‘15 |
OLK10 | WH-915D | 5.0 MWe | Operating since June. ’15, handed over in Jun. ’15. |